Railway Systems
From 2013. till the present day
2017.
Vinarce - Đorđevo (15 km)
Execution of works on reparation and rehabilitation of signalling and telecommunications devices and facilities within works on the reconstruction and modernization of railways on the Trans-European transport Corridor X .
Vranjska banja – Ristovac (17,7 km)
Execution of works on reparation and rehabilitation of signalling and telecommunications devices and facilities within works on the reconstruction and modernization of railways on the Trans-European transport Corridor X .
Bujanovac-Bukarevac (13,8 km)
Execution of works on reparation and rehabilitation of signalling and telecommunications devices and facilities within works on the reconstruction and modernization of railway on the Trans-European transport Corridor X .
2016.
Building of delevelled railway crossing on Beograd – Šid – country border railway in Fruškogorska street and crossroads of streets Fruškogorska, Planinska and Dr Milana Kostića in the city of Sremska Mitrovica – Phase 1: - Signalling and security adaptation of railway system in station Sremska Mitrovica due to removal of the level crossing; - Works on resolving railway telecommunications cables collision caused by civil works.
2015.
Mala Krsna – Velika Plana (29,4 km)
Rehabilitation of signalling and telecommunications facilities within reconstruction of Serbian railways on Beograd - Niš – country border railway, section Mala Krsna – Velika Plana.
Sopot Kosmajski – Kovačevac (18,4 km)
Rehabilitation of signalling and telecommunications facilities within reconstruction of Serbian railways on Beograd - Niš – country border railway, section Sopot Kosmajski - Kovačevac.
Railway station Beograd Centar – Phase 1
Installation of external and internal safety and signalling equipment within the project of signalling and security systems modification in station Beograd Centar, junction Karađorđev park and junction Dedinje.
Golubinci - Ruma (17,9 km)
Rehabilitation of signalling and telecommunications facilities within reconstruction of Serbian railways on Beograd - Niš – country border railway, section Golubinci - Ruma.
Pančevo bridge - Pančevo (14,9 km)
Realocation of electrical and telecommunications cables; installation of fire alarm system, works on sound, video surveillance and clock systems as part of second rail track construction on railway section Pančevo Bridge – Pančevo Glavna (km 4+742-km 19+600, lenght 14.858m).
Before 2013.
1. Installation of railway telecommunication devices:
Beograd – Preševo
Inđija - Novi Sad - Subotica – country border
Beograd – Vrbnica
Beograd - Vrbnica
2. Building up of telecommunication cable trenches for the route:
Nemanjina – Central railway station - Prokop
3. Manufacturing of cable facilities:
Niš-Dimitrovgrad
4. General overhaul of the railway station in Subotica
5. Maintenance of safety and signaling devices:
Beograd – Preševo
Beograd - Bar
6. Overhaul of signaling devices in 7 stations Lešak
8. Railway reconstruction:
Petrovaradin - Čortanovci
9. Station Bablak overhaul (KTA/URBS/19-04/2004R)
10. Signaling cables displacement (2 phases):
Valjevo - Slovac
12. Telecommunication cables displacement in Dimitrovgrad
14. Signals overhaul in tunnel Bela Reka
15. Installation of safety, signaling and telecommunication devices in station Jabuka
16. Cables refurbishment along railway bridges:
Niš - Dimitrovgrad
17. Signaling cables refurbishment:
Čortanovci-Petrovaradin
18. Installation of safety and signaling and telecommunication devices:
Vrbnica - Bijelo Polje
19. STA cables refurbishment on Ostružnica bridge
20. Reconstruction and modernization of railway telecommunication facilities:
Batajnica - Golubinci
21. Civil works on railway:
Zablaće - Kraljevo
22. Wiring of safety signaling devices in station Vreoci
23. Reconstruction of railway station Inđija
24. Railway utilities displacement in the route Careva Ćuprija – Ada bridge
25. Building up of railway crossings in the municipality of Sabac
26. Reconstruction of Serbian Railways at the border with Croatia
and more….